Pretty decent order from Nissan came in. Consisted of various bushes, suspension gear, wheel/diff bearings, nuts, bolts, badges etc.
Putting together the rear suspension struts was very fun. (This was before the wheel studs came in)
I also had a go at "Cold Bluing" the steering column components. I think this was how it was done from the factory, someone correct me if i'm wrong. Came up pretty good. Sandblasted, cleaned, cleaned again, waited until it was 100% dry and simply rubbed the stuff on and washed it off under cold water. Pretty cool stuff!
It's very hard to get a proper photo of how it turned out, but it came out pretty good.