Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 08/06/2021 in Posts

  1. HS30-H

    HS30-00332

    It's just another example of how the historical narrative around these Japanese cars is totally dominated - to their detriment - by the 'An American Car, Made In Japan'/'Made For The USA' babble. It's got to the stage now where even Nissan Japan's own press office are swallowing and regurgitating misinformed and skewed American opinion. Nissan took the Australian and NZ markets just as seriously as the North American market, and the S30-series Zs were a part of that. Australian & NZ models have a significant place in the S30-series' history and deserve to be properly recognised.
    2 points
  2. Welcome mate just don’t say “I’m chasing” or “I’m looking for” in the WTB section. It’s @C.A.F. Lachy’s favorite past time replying to them. Lol
    2 points
  3. Hi Guys I have recently refreshed the near stock L26 fitted to my 76 260 coupe and thought I'd share the results just in case any others wanted to go down this path. The engine was started out basically stock with only mods being removal of the air pump and EGR, installation of 240 carbs, HM headers into 2 1/4 exhaust and a 240 A grind cam shaft and 280 trany ign, (all of which I installed 18 years ago), this engine span up freely and made around 88 rwkw -up from the standard 76 rwkw of a "stock L26) at around 5800 rpm but seriously lacked any torque (due to low 8.3:1 comp) .....so made lots of noise but no "shove" in the back. With the refresh I wanted to retain the original block and keep the car as "standard" as possible but at the same time extract some extra welly so I decided to go down the path of upping the compression by installing flat tops and making it breath with bigger inlet valves. The engine was stripped down and found to be in excellent condition for its 250,000 hard km with the bores only requiring a light hone, the crank was spotless and all bearing journals still standard size. The head was cleaned up, ported and CC'd by Chris Wood who also installed stainless valve seats and 280zx inlet valves, Chris also lightened the fly wheel and the crank and I then had the crank and fly wheel balanced. New standard bore 83mm flat top pistons were sourced from Lindsay Drife (rare as rocking horse poo!) and the engine reassembled with all new timing gear, bearings and a new turbo 280zx oil pump. BTW - The flat tops produced a comp ratio of aprox. 10:1 so premium pump fuel would be fine (98 RON) The only missing link was the cam shaft, Wades had new billet cams on back order so we reinstalled the 240 A grind cam and refitted the engine. After a thousand kms on the fresh engine it was time to run it up on the dyno, the engine was making a mountain of torque up to 4000 rpm (40% more than the standard engine) but ran out of puff after 5000 rpm. The dyno results confirmed that the engine was horribly asthmatic with this standard 240 cam struggling to 98 rwkw, but making an enormous amount of low end torque (it felt like driving a turbo diesel !) and desperately in need of some lift and duration, hitting 5500 rpm was like hitting a rev limiter with the engine dying suddenly from lack of air ! The engine is beautifully smooth to drive pulls like a train up to 4000 however just needs more air to breath ...... Well having waited 12 months for an internal oiling billet cam shaft, I had a 70/30 grind prepped by Camtech which 230 deg duration and .450 lift (very close to the standard Roadster grind) , I did not want to go overboard with a huge cam as I wanted a nice streetable engine that can still handle a/c and idle nicely and not sacrifice low down torque for top end power. Trial fitting the new cam we were pleased to find that the cam/lobe wipe is perfect and I can retain the standard lash pads, the rocker arms were sent off to Wades for resurfacing (to match the new cam) . The new camshaft was installed and dialed in last night with the help of Lou Mondello, the valves springs checked for binding and found to be fine for reuse) the rocker arms will be back from Wades today so final assembly and run in will be completed tonight. After run in it will be time to run it up on the dyno for a mixture tune and some power runs..... We anticipate around 110 rwkw at 6300 rpm on the standard 240 carbs (without any loss of low end torque)........any more will be a bonus. Anyway for those intersted in a nice streetable L26 refresh this may be the path to follow. Stay tuned for dyno results cheers Alan
    1 point
  4. ben92

    Ben's 75 260z

    Damn, I'd suspected that. A couple of mates have said it'll smoke a lot if it's been sitting and not driven for a long time, so I was hoping that was that case instead. I also had someone suggest valve seals need to be replaced. I talked to a local mechanic today that can tackle an engine rebuild if necessary, I'll most likely end up going down that route. I don't suppose there's a reliably better-than-OEM set of rings for an L28 that anyone could link me to? No idea whether the engine has standard size pistons or not so I guess I'll need to figure that out first. The little cylindrical guys behind a single screw on the left of the carb near the float window? I did find and check them! One had a hole in it so I stole a filter from the spare set of carbs. Cheers for this! Looks more detailed than the Haynes manual I've been going off. I did add choke cables as well for the first time after going off the carbs so I wonder if I've set them up wrong and that's causing the high idle. Will report back...
    1 point
  5. hmd

    HS30-00332

    $1000 for series one car owner
    1 point
  6. Herbie

    1974 260Z 2+2 Auto

    When was it that you came to see what I have spent on and done to the car in the past 12 months??
    1 point
  7. Gilltech I also considered an L28, however like you wanted to keep matching numbers, the L28s are also less willing to rev and can be agricultural unless lots of $$$ are spent (IMHO) My refresh ended up around $3.5K which included the following Engine block hot tank and light hone New standard bore L24 flat top pistons Cylinder head work including new 280zx inlet valves, new stainless valve seats, porting and combustion chamber CCing. Fly wheel lightening and crank balancing All new replacement timing gear,chain guides etc, new 280zx hi vol oil pump. I basically renewed every item I could.......apart from new parts most money was spent on the head work and flywheel machining and balancing of the flywheel crank and rods. I also sourced all the parts from a wholesaler so got very cheap prices. My mate who specialises in Roadster race engines also assisted me quite a bit with the reassembly. I would expect the same build would be around $5k if I had an engine builder do all the work. ......the end result is a fresh engine better than new, nicely balanced, smooth revving and a great tractable street drive. The final $$ come down to what you want done and how bad the starting point is, if you have a stock untouched L26 that has not been butchered, it can be transformed into a great thing. cheers Alan
    1 point
×
×
  • Create New...