Well I picked up my Zed last night so thought I'd better get the build journal going.
I am determined to have this zed fully registered by April 2014, why? Because if I don't set a goal it's just gonna sit in the shed like all my other projects
A lot of work has been done on this car by previous owner, Shanan who has a build thread on here for the car. It's got a fuel injected l28 which needs a little sorting
Coil overs fitted
Rear disc brake conversion
Has has a new centre console fitted
Dash has been reconditioned
Much of the interior has been done with only seats really needing a retrim.
Many of the rubbers have been done.
What needs doing.
Rust needs to be repaired ( not as bad as my last zed I hope)
Car will then need a respray but I'm gonna keep it the original gold as its grown on me .
New wheels fitted. I havnt decided on size and style yet
Seats retrimmed
Electrics finished off
Engine sorted out and maybe some goodies for a bit more go ( currently seems to be running on five cylinders so the extra cylinder may be all the go I need)
Brakes need sorting , there's currently no hand brake and front right caliper seems to have ceased.
Sounds easy, so why would I finish this project when I havnt finished any if the others?
For starters I'm not gonna think about the cost
And out of the many many cars I have owned I have never loved driving anything as much as a zed.
So I call on everyone to push me along and I'm sure to be asking for much help along the way.